Project Description

A domestic client base in Brighton requested an access scaffold platform be constructed over the conservatory area on the rear of the property for the renewal of the soffits and fascias. A support tower was built on the left hand side of the conservatory two lifts high. 6m alloy Layher beams were used to span from the support tower across the conservatory roof to the balcony area on the right hand side. This was the correct height for the works with a boarded and handrailed platform positioned at this level accessed from the balcony area.